Notice Text:

The maintenance downstream of FGT Compressor Station 4 has been completed. FGT will return to normal scheduled volumes of up to 230,000 MMBtu/day east through Station 4 starting February 13, 2026.

FGT will be performing maintenance at FGT Compressor Station 75. This maintenance will start February 23, 2026, and extend into March 2026. On the first day of this maintenance, February 23, 2026, FGT may schedule up to 700,000 MMBtu/day through Station 75. Starting on February 24, 2026, and continuing through the end of March 31, 2026, FGT may schedule up to 900,000 MMBtu/day through Station 75. During normal operations, FGT schedules up to 980,000 MMBtu/day through Station 75.

FGT will be performing maintenance at FGT Compressor Station 8. This single day maintenance will start February 17, 2026, and is to be completed by end of gas day February 17, 2026. During this maintenance FGT may schedule up to 850,000 MMBtu/day through Station 8, During normal operations, FGT schedules up to 1,075,000 MMBtu/day through Station 8.

FGT will be performing pipeline maintenance on the mainlines between FGT Stations 9 and 10 mid-February. No throughput reductions are expected during this maintenance; however, there is a small possibility that throughput could be reduced for possible more extensive maintenance needs.

FGT will be performing maintenance downstream of FGT Compressor Station 12. This maintenance will start February 16, 2026, and will continue into March 2026. During this maintenance FGT may schedule up to 2,800,000 MMBtu/day through Station 12, During normal operations, FGT schedules up to 3,175,000 MMBtu/day through Station 12.

FGT will be evaluating winter weather conditions before starting these February scheduled maintenance activities to determine if any should be delayed because of current winter weather conditions.